Found in a full fact audit of all 22 pages on 8 November 2026, and fixed the same day. Listed so you can see what changed.

For Rob

Heat pumps, underfloor heating, the grant and the prices page.

Question 1
Which figure moves: the before-grant prices, or the £4,000 to £8,000 after-grant range?
What the site says now
The prices page headline says most homes pay £4,000 to £8,000 after the grant, and the table says £12,300 to £15,900 before it. Take £7,500 off the table and you get £4,800 to £8,400, not £4,000 to £8,000.
What we have on file
You agreed £4,000 to £8,000 on 6 November, on the basis that the before-grant ladder would move to match. The headline changed; the ladder did not.

This one is ours, not yours. The page whose whole job is price transparency currently disagrees with itself, so it is first on the list.

Question 2 Answered 12 Nov
What are Elevate's own underfloor heating prices per square metre?
Rob's answer, 12 November
£25 to £30 per m² for a screed system, £60 to £70 per m² for an overlay or routed chipboard on joists. Thank you, this had been open since the site was built.
One thing before we publish them
Do those figures include the installation, or are they the system itself? When you sent the heat pump prices in September you spelled it out: they include “the heat pump, cylinder, standard ancillaries, controls, installation, commissioning, and design work”. For underfloor you listed the panels, pipe, manifolds and controls, and did not mention fitting. The numbers currently on the site are national installed averages, so one word from you settles whether these replace them or sit beside them.

Once yours go on, the page also has to stop saying retrofit costs 40 to 50 per cent more than new build. On your figures it is more than double.

Question 15
Is uneven stair tread height actually against building regulations?
What you said on 12 November
That an overlay upstairs leaves the last tread higher than the rest, and “I believe is against building regs because every tread should be the same height.”
Why we are asking
You hedged it with “I believe”, and we will not publish a regulation as fact on that basis. It is a good, concrete reason not to overlay upstairs, so we would like to use it with the regulation named and linked.

If you are not certain, say so and we will check Approved Document K ourselves.

Question 3
Carpet and underlay: is the limit 2.5 tog, or 1.5 to 2?
What the site says now
“Above 2.5 tog of carpet and underlay, the heat cannot get through.”
What we have on file
You said you work to 1.5 to 2 tog.

A customer who buys a 2.4 tog carpet on the strength of our website is outside your own rule.

Question 4
How long does a heat pump installation actually take?
What the site says now
“Usually between three and nine working days.”
What we have on file
You said “about a week”.
Question 5
What lifespan should we publish for a heat pump?
What the site says now
The heat pumps page says 20 years. The Learn article mentions a 12-year-old unit.
What we have on file
Nothing on file settles it.
Question 6
Can we stand behind “very few installation companies carry design cover at all”?
What the site says now
Stated as fact on the insurance page.
What we have on file
No source. It may well be true, but nobody has established it.

If it is your judgement rather than a known figure, we can say so in your own words instead.

Question 7
Is it fair to say nobody local publishes underfloor or commercial prices?
What the site says now
“Nobody local publishes underfloor prices” and “nobody in this trade publishes commercial prices.”
What we have on file
No source. It is the kind of claim a competitor can disprove with one page.
Question 8
Heat pump plus underfloor: “the most efficient pairing in domestic heating”. Yours, or somebody's research?
What the site says now
Stated flatly, no attribution.
What we have on file
No source on file.

If it is your view we will attribute it to you, which reads better anyway.

Question 9
Where does the 42 dB sound figure come from?
What the site says now
Used as a precise noise claim on the heat pumps page.
What we have on file
Our own research file grades it unverified and advises against publishing precise dB figures.
Question 10
Which 2025 change relaxed the permitted development rules, and when?
What the site says now
“The rules were relaxed in 2025.” No date, no link.
What we have on file
No date in the source. You agreed on the call that a link would go in.
Question 11
Mere End: is “family-run” their own description, and are they in Cheshire rather than Staffordshire?
What the site says now
The draft page describes them as family-run and based in Staffordshire.
What we have on file
Their registered office is Alsager, which is administratively Cheshire. “Family-run” was our inference from two directors sharing a surname.

Small, but it is on a page whose entire purpose is that a customer can check the facts for themselves.

Question 12
Do you know Mere End's real lead time on a grant application?
What the site says now
The Boiler Upgrade Scheme article advises a last date to enquire if you want the £9,000 rate. It was built on an assumption, not a confirmed lead time.
What we have on file
Our own facts file says to confirm this with Ofgem before publishing it. It was published anyway. The figure is conservative, so it costs us enquiries rather than misleading anybody.

Nick is going to Ofgem for this, but if Mere End have told you a real turnaround, that is better.

Question 13
Do you install underfloor heating yourselves now, or is it still design and supply?
What the site says now
The underfloor heating page says the system is “installed by us”, and the page's description in Google says “designed, supplied and installed”.
What we have on file
On 15 September you said you had not done underfloor installations, because you do not do them. On the same call we agreed the site should move towards installs, so this may simply have moved on since.

It is the first line a customer reads on that page, and it decides who they think is turning up.

Question 14
Around fifty heat pumps in your first year: is that still the right number?
What the site says now
The about page says we designed and supplied around fifty heat pumps in our first year. It said “fitted” until today, which was wrong, because on most of those the plumber fits it.
What we have on file
You said it on 23 July, but hedged: “I think we done what, fifty, maybe 50 in our first year at Elevate.” On 12 November, talking about photographs, you said “we haven't done a massive amount of heat pumps, we do loads of AC”, though the line was partly lost to the phone.

It is the one number on the about page a customer could use to size us up, so it is worth being sure of.

Question 16
The two-year workmanship warranty in the MCS installer contract: can we say it on the site?
What the site says now
Nothing. There is no mention of a workmanship warranty anywhere.
What we have on file
The MCS installer contract you forwarded in September requires the installer to give Mere End “a workmanship warranty for any installation work carried out”, valid for a minimum of two years and “transferable to the new owner in the event that the client moves home”, plus support to the homeowner with future maintenance.

On jobs we install, that is a promise we are already contractually making and never telling anyone about. It answers the question every customer has and nobody asks out loud: what happens if it goes wrong, and what happens if I sell the house.

Question 17
Who actually gets the electricity network permission, us or the customer?
What the site says now
The Boiler Upgrade Scheme article treats the National Grid application as a step we handle.
What we have on file
The MCS end user contract puts it on the customer: clause 3 makes the client responsible for ensuring “any necessary permissions from the District Network Operator have been obtained”, alongside planning and building permissions.

The contract and the website currently say different things about whose job this is. The customer signs the contract, so if we are doing it for them as a courtesy, the site should say that rather than imply the obligation is ours.

Question 18
Can we name the RECC consumer code on the site?
What the site says now
Nothing. RECC is not mentioned anywhere.
What we have on file
Both MCS contracts require the work to be carried out in accordance with the Microgeneration Certification Scheme and the RECC consumer code.

It is a second, independent consumer protection sitting behind every job, and it costs us nothing to point at.

Question 19
The two photographs you sent on 12 November: are both of those our own installations?
What the site says now
Both are live. The Vaillant and Mitsubishi pair is on the about page, the Daikin monobloc on the heat pumps page, in a section headed “our own photographs, taken on site”.
What we have on file
On the 12 November call you said you would not publish photographs of jobs we only supplied, because they are somebody else's installation. You chose these two afterwards, so we have assumed they are ours.

Your rule, not ours. One word confirms it and we stop worrying about it.

For Declan

Air conditioning prices, commercial work and lead times. Every one of these is a published price.

Question 15
What does air conditioning for a four-bedroom house actually cost?
What the site says now
£5,000 to £6,000. It appears in the hero, the prices section, the FAQ, the page's Google description, and the homepage FAQ.
What we have on file
Your own quote exports: five rooms off one outdoor unit at £9,646, six zones at £12,036. In September you said £8,000 to £12,000 for five rooms. £5,000 is your figure for two rooms.

This is the most visible price on the site and the one most likely to produce an awkward conversation at quote stage.

Question 16
And £3,000 to £3,500 for the same house on several outdoor units?
What the site says now
Published on the air conditioning page as the cheaper alternative.
What we have on file
It came from an off-the-cuff remark in July. Your export shows two rooms on separate outdoor units at £5,599.

It is the cheapest number on the whole website.

Question 17
Where do commercial jobs really start?
What the site says now
“Commercial projects start around £13,000”, on the homepage.
What we have on file
You said “I think that's about 13 or 14 grand” about one particular office. Your real commercial quotes include £2,986, £4,244, £6,645 and £8,401.

As written it tells a small shop or surgery not to bother ringing.

Question 18
The £13,000 to £14,000 office: was it small or medium sized?
What the site says now
“A medium-sized open-plan office with three units.”
What we have on file
You described a small open-plan office, and hedged the figure with “I think”. The approved draft carried an instruction to verify it with you, which never happened.
Question 19
Which job is the £78,000 retail building?
What the site says now
“Around £78,000 for a large retail building running fourteen indoor units.”
What we have on file
Also hedged with “I think”. The nearest real quotes in the export are £49,149 and £65,666 to £71,122.
Question 20
Topsham Rugby Club: the club, or one of the players?
What the site says now
“We are proud to sponsor Topsham Rugby Club.”
What we have on file
You said you sponsor one of their players, and separately that sponsoring the club is something you would like to do.

Worth getting right. It is the kind of thing somebody at the club will read.

Question 21
What are air conditioning lead times right now, domestic and commercial?
What the site says now
The Learn article says most equipment is unavailable until the end of February 2027 and supply will not be comfortable before the middle of 2027.
What we have on file
True in November 2026. The article gets read in spring, which is when it matters.

A quarterly check is now set up for this automatically, but a fresh figure from you now is better than our last one.

For Nick

Two decisions that are ours rather than theirs.

Question 22
Should the contact form let people attach photographs?
What the site says now
The heat pumps page says an outline estimate needs only your plans or a few photos. The form has no upload field. The contact page does say we will ask for photos when we reply, so nothing is untrue, but somebody will go looking for an upload button.
What we have on file
File attachments on Web3Forms, the form service the site uses, are a paid feature: one file up to 5 MB on the standard uploader, more on the advanced one. The price is behind a page that blocks automated checking, so it needs a look in a browser.

Either we pay for it and add a real upload field, or we take the implication out of the heat pumps page. Your call.

Question 23
Is there an email address we can publish?
What the site says now
There is no email address anywhere on the website. Phone and form only.
What we have on file
We have info@elevate-limited.co.uk on file, but that is the old domain.

Plenty of people will not fill in a form and will not ring.

Written 8 November 2026 from a full fact audit of every page against the transcripts, quote exports, insurance and certification documents and the verified facts files.